Mechanical

Description

A small section of LTHW pipework was heavily corroded, requiring immediate attention.

Our works on this small project involved safe isolation of the trace heating circuit, isolation and drain down of LTHW pipework, new bracketry, installation of new 2 inch mild steel screwed pipework, pressure testing, re-instatement of trace heating and new foil faced phenolic foam pipe insulation complete with black PIB sheet finish.